Get in touch with us at sales@ultraaqua.com or use the form below. We will get back to you within 24 hours.
A municipal wastewater treatment plant in Sweden initiated a project to upgrade its existing ozone setup, increasing capacity and renewing the installation as part of a dedicated sidestream process for sludge water treatment. The project was driven through the early stages together with Christian Berner, supporting the utility with project documentation, planning, and specification work to prepare for a forthcoming tender process for expansion of the current setup.
The application builds on established full-scale operating experience showing that controlled ozonation of activated sludge sidestreams can improve settling properties and help mitigate operational issues associated with filamentous bulking.
The plant required a compact and operationally safe ozone solution that could be implemented with minimal disruption to an operating facility. The project team chose a complete containerized solution to avoid constructing a new building and to simplify on-site implementation, targeting an ozone capacity of 1 500 g O₃/h, and supported by a structured execution plan.
Key deliverables include P&ID and functional description, approved drawings, defined FAT activities, delivery logistics, commissioning/inspection, operator training, and full documentation for handover and long-term maintenance.
Get in touch with us here. We strive to get back within 24 hours on all inquiries.
Please provide your details below to request acccess to the ULTRAAQUA Partner System. We will get back to you shortly.